Battersea Powerstation

B&R were awarded Battersea Powerstation as part of MACE's Phase 2 works having originally helped with the prefabrication concept at tender stage, helping MJL to secure the project. The work consists of the fabrication and installation of pre-fabricated pipework modules, as well as the installation of the fixed Gantry to facilitate the movement of the modules down into the basement area without the need for long term crane hire. 

Having completed a number of mock ups in late 2018 at our factory, B&R began fabricating and delivering the modules in early 2019. The modules are designed to minimise time onsite compared with a traditional installation and reduce the number of trades onsite required to complete a single installation. The work is expected to continue throughout 2019 and in to 2020.