Page 13 - Offsite Manufacturing
P. 13

 IMPERIAL COLLEGE - BESPOKE FLUE
CLIENT - MICHAEL J. LONSDALE MAIN CONTRACTOR - ISG CONSULTANT - HOARE LEE
Working with MJL at the pre-construction stage B&R designed the 2 sets of flue banks which consisted of treated PVC duct for the laboratory fume extracts. Completely built at our facility the single modules consisted of 5 tonne of galvanised steel and 100m of 900 diameter PVC ducting.
Each bank was installed in a single day under a contract lift with 700 tonne crane carried out by B&R, with a traditional install estimated at 20 days with
full use of the crane this gave a reduction of 95% time onsite and received commendation from our client. It was also featured in an online ‘Construction Manager Magazine’ in November 2017.