Page 12 - Offsite Manufacturing
P. 12

Case studies
 LONDON SCHOOL OF ECONOMICS - AHU MODULE
CLIENT - DORNAN ENGINEERING MAIN CONTRACTOR - MACE CONSULTANT - CHAPMANBDSP
Originally intended as a traditional installation we were called to come up with a solution to enable an AHU and associated ductwork to be installed at the far end of the roof where the
area could not be easily accessed by installation operatives.
We subsequently designed a frame to suit the configuration and pre-installed the AHU and ductwork at our facility. We also fitted the frame with pre certified lifting eyes tested by our in-house lifting equipment examiner. Once at site it was then lifted into position and installed within an hour mitigating the
risk associated with what would have been an awkward multi day
traditional installation.
       