Houses of Parliament


Client(s):      MITIE, Imtech Inviron

Value:            £1.5M – £2.5M

Duration:      2012-1018

B&R Installations are currently carrying out various works as part of the huge restoration project currently being undertaken by the Government to keep this building as the centre point for British politics. The Houses of Parliament has and still is our largest project to date. We began works in 2012 and expect to still be on site come 2018. Working for MITIE Built Environment and more recently Imtech Inviron, we have constantly had to comply with the strictest of health & safety policies and specifications as well as dealing with logistical & security constraints at what is arguably the most iconic building in the world.

Due to the nature of the building we are unable to show any pictures of our work or specifications. However on this site we have completed both the steelwork and ventilation packages in addition to numerous crane lifts. We have provided a complete turn key service including elements of design, structural calculations as well as offsite warehousing and logistics on top of our 3 core disciplines. It is our high quality of service and ability to adapt to the clients needs whilst on this project that has won us the attention of some of the UK’s largest contractors which B&R are now working with. The value of the project to B&R has multiplied over 50 fold from the original order which is testament to the quality of service and range of solutions that B&R offer.

Contact Us

All Rights Reserved. © 2018 Engineering

http://www.bandrinstallations.co.uk